Results 1 to 3 of 3
-
05-18-2024, 05:00 PM #1
New NLG Service Bulletins Summary
ICON released three Service Bulletins last week related to the Nose Landing Gear uncommanded retractions. It took me a little while to sort them out.
SB-012624-A NLG Limit Switch Over-Engagement (Mandatory)
This SB provides updated rigging instructions and design improvements for the new Retrofit Limit Switches that came out in October 2023 (SB-080323). If you don't have the new Limit Switch this is not required. An inspection is due within 5 runway landings; if the inspection passes the repair can be deferred to next condition inspection.
SB-032420-C Recurring Inspection of Nose Landing Gear (NLG) Actuator Rigging
This inspection is now due every 50 hr or 6 months (whichever comes first), instead of every 100 hr or annual condition inspection. The inspection is not required if either SB-080323 or SB-012724 (NLG Limit Switch Retrofit) have been completed.
SB-012724 NLG Limit Switch Retrofit
This is a new version of the NLG Limit Switch Retrofit SB (mechanical limit switches with long arms). It replaces SB-080323 and incorporates the updated rigging instructions and a design improvements included in SB-012624-A. You don't need to do this if you have already done SB-080323 (instead you do SB-012624-A). It is due at the next service interval. Once you perform this SB, you don't need to do the recurring Inspection required by SB-032420-C.St Petersburg, FL - N1BA #140 Icon G3x & N329MC Phenom 300 -
05-19-2024, 06:31 AM #2
- Quick Links
- New Posts
- Participated
- Subscribed
- Today's Posts
- Hot This Week